For over 30 years, Caran has served the Industrial-Commercial sector in the Greater Toronto Area and across Southern Ontario. The project details we have collected below will give a window into our commitment to quality and client satisfaction. Browse through them, and contact us about your project needs.
This 150,000sf building was completed with 2-storey office/mezzanine overlooking a 9-bay loading and warehouse area.
Nearly 15 years after constructing the original building, Caran was called on to complete an addition of drive-through service bays and 2-storey office space. This also included renovation of the existing office areas.
Completed the shell building, including exterior finish, for a 20,000sf grocery store with 5,000sf office in a popular urban plaza.
New truck maintenance facility with fuel station and parking on an 8 acre parcel of land
The manufacturing plant originally built by Caran was expanded by 20,000sf, complete with installation of 30-tonne cranes.
Completed 50,000sf of 2-storey offices with full basement and service elevator.
An 18,000sf welding shop was constructed, complete with finished offices.
Cross-dock, truck maintenance garage and 2-storey offices were constructed on this 8.5-acre site.
Manufacturing plant and corporate offices with an open mezzanine.
This expansive warehouse/distribution facility consists of 116,000sf floor area with office space and loading docks.
This project entailed constructing an equipment maintenance garage combined with a rental office space.
45,000sf manufacturing plant with 2-storey office, was later expanded in a more recent project.
This project consisted of a tanker-truck washing facility with 6 drive-through bays and 2-storey finished offices.
Along with adding warehouse area to the existing facility, spaces for Parts & Service and 2-storey offices were created.
A drive-through wash bay was needed as an addition to the existing facility, along with a new fuel dispensing system.
This project featured the design and construction of corporate headquarters and manufacturing plant.
Building consists of 24,000sf of finished office and cross-docks, with a 10,000sf maintenance garage on a 6.3-acre site.
Completed this truck maintenance garage with service pits, on an 11-acre site, including 2-storey offices and a fuel dispensing system.
Existing warehouse/shipping area was expanded by nearly 75,000sf.
Interesting project, in converting an old CNR building into a 50-door cross-dock with warehouse. Also constructed a new truck maintenance facility on site.
This 5-acre truck rental and maintenance facility required 4 drive-through repair bays with service pit, 2-storey offices, and a separate truck wash building with fuel dispensing system.